ADELAIDE  YARD  ELECTRIFICATION



Adelaide Railway Station closure - 2 January to 3 February 2013 The Adelaide Railway Station (ARS) will be closed between 2 January and 3 February 2013 (the quietest time of the year), for coordinated and accelerated major rail and project works. Works being coordinated to complete the track upgrade of Adelaide’s rail network (including the city rail yard), electrification of the Noarlunga and Tonsley lines, building a rail underpass at Goodwood to improve travel times.

Click HERE for larger picture




Adelaide Rail Yards 3rd January 2013 with work on erecting the Catenary Poles with the South Australia's Health & Medical Research Institute Facility building in the background. The building with the SAHMRIF sign on it the first building to get built on the Hospital site the former Adelaide Railcar Depot site.



(Pics by Barry Simmons)

3rd January 2013
Click HERE for larger picture
Adelaide Rail Yards with work on rail electrification
& erecting of Catenary poles. Looking West.

3rd January 2013
Click HERE for larger picture
Adelaide Rail Yards with work on rail electrification
& erecting of Catenary poles. Looking West.


3rd January 2013
Click HERE for larger picture
Adelaide Rail Yards with work on rail electrification
& erecting of Catenary poles. Looking West.

3rd January 2013
Click HERE for larger picture
Adelaide Rail Yards with work on rail electrification
& erecting of Catenary poles. Looking West.


3rd January 2013
Click HERE for larger picture
Adelaide Rail Yards photo’s from
 the Morphett St Bridge. Looking West.

3rd January 2013
Click HERE for larger picture
Adelaide Rail Yards photo’s from
 track level. Looking West.


3rd January 2013
Click HERE for larger picture
Adelaide Rail Yards photo’s from
 track level. Looking West.

3rd January 2013
Click HERE for larger picture
Adelaide Rail Yards photo’s from
the Morphett St Bridge. Looking West.


3rd January 2013
Click HERE for larger picture
Adelaide Rail Yards with work on rail electrification
& erecting of Catenary poles. Looking West.

3rd January 2013
Click HERE for larger picture
Adelaide Rail Yards with work on rail electrification
& erecting of Catenary poles. Looking West.


3rd January 2013
Click HERE for larger picture
Stop Boards on entrance of Adelaide RWS
under Morphett Street Bridge. Looking East.

3rd January 2013
Click HERE for larger picture
Stop Boards on entrance of Adelaide RWS
under Morphett Street Bridge. Looking East.


3rd January 2013
Click HERE for larger picture

3rd January 2013
Click HERE for larger picture

From Port Road Bridge Thebarton looking towards Goal Loop showing the western end of the Adelaide Rail Yards work with the WYE Signal Cabin in the background. Looking North.


Return to top of page



THE  SKYLINE  IS  NOW  ALSO  CHANGING
12th January 2013

(Pics by Greg O'Brien)

12th January 2013
Click HERE for larger picture
Adelaide Yard cleared of city trackage.

12th January 2013
Click HERE for larger picture
Adelaide Yard. Ex railcar Depot in background.


12th January 2013
Click HERE for larger picture
Railcar stabled Gaol Loop. South track cleared.

12th January 2013
Click HERE for larger picture
South line trackage been cleared away.


12th January 2013
Click HERE for larger picture
TNo1311. CLF5, 701, GM38, 221 gaol loop.
Adelaide Yard. South line trackage removed.

13th January 2013
Click HERE for larger picture
TNo: 2182. 2216, GM42, GM45, 2207, FQ01
 Gaol loop Adelaide. South line track removed.


12th January 2013
Click HERE for larger picture
The old s.a.r. WYE  cabin still stands.

12th January 2013
Click HERE for larger picture
Gawler railcar 3110, 3109, 3007 on “old Gaol loop line”


Return to top of page



CATENARY  POLES  NOW  ERECTED
21st January 2013

(Pics by Barry Simmons)

21st January 2013
Click HERE for larger picture
Erected Catenary Poles Adelaide Rail Yard.
Looking West.

21st January 2013
Click HERE for larger picture
Erected Catenary Poles Adelaide Rail Yard.
Looking West.


21st January 2013
Click HERE for larger picture
Erected Catenary Poles Adelaide Rail Yard.
Looking West.

21st January 2013
Click HERE for larger picture
Erected Catenary Poles Adelaide Rail Yard.
Looking West.


21st January 2013
Click HERE for larger picture
Erected Catenary Poles Adelaide Rail Yard.
Looking South West.

21st January 2013
Click HERE for larger picture
Erected Catenary Poles Adelaide Rail Yard.
Looking North West.


21st January 2013
Click HERE for larger picture
Erected Catenary Poles Adelaide Rail Yard.
Looking West.

21st January 2013
Click HERE for larger picture
Erected Catenary Poles Adelaide Rail Yard
with stop boards on each track under the
Morphett Street bridge. Looking East.


28th January 2013
Click HERE for larger picture
Catenary Poles in the Adelaide Rail Yards.
Looking West.

28th January 2013
Click HERE for larger picture
Catenary Poles in the Adelaide Rail Yards.
Looking West.


Return to top of page



ADELAIDE  STATION  FACELIFT
28th January 2013

28th January 2013
Click HERE for larger picture 
Inside of the Adelaide Railway Station.

28th January 2013
Click HERE for larger picture
Adelaide Railway Station refurbish.


16th April 2013
Click HERE for larger picture
Adelaide Railway Station Riverbank precinct side.
Looking South,

Return to top of page



MORE  CATENARY  POLES  ERECTED  AND  TRACKAGE  LAID  DOWN
4th February 2013


After a one month closure of the Adelaide Railway Station to passenger railcar services, the Outer Harbour / Grange Line and Gawler Line Trains resumes service to platforms 7 – 8- 9 in the Adelaide Railway Station this morning Monday 4th February 2013 . This is the first day these railcar services resumed under a changed skyline of Catenary Poles for the electrification of the Adelaide Rail Yard – Station, and the installation of a new Nairne Junction, a four parallel track crossover double piece of rail infrastructure that was constructed off-site adjacent to the location. 


(Pics by Barry Simmons)


4th February 2013
Click HERE for larger picture
Adelaide Rail Yard & new crossover "Nairne Junction".
Looking West.

4th February 2013
Click HERE for larger picture
Adelaide Rail Yard new crossover "Nairne Junction".
Looking West.


4th February 2013
Click HERE for larger picture
Adelaide Rail Yard Looking West.

4th February 2013
Click HERE for larger picture
Railcars 3113/3114 Adelaide Rail Yard Looking West.


4th February 2013
Click HERE for larger picture
Adelaide Rail Yard with Outer Harbour and
Gawler Trains. Looking West

4th February 2013
Click HERE for larger picture
Adelaide Rail Yard with Outer Harbour & Gawler Trains
Looking West
Click HERE for larger picture
Adelaide Rail Yard new crossover "Nairne Junction".
 Looking West.


4th February 2013
Click HERE for larger picture
Adelaide Rail Yard Looking towards Morphett St. Bridge.
Looking East.

4th February 2013
Click HERE for larger picture
Adelaide Rail Yard Looking towards Morphett St. Bridge.
Looking East.



Adelaide Station/Yard Reopens
4th February  2013

(22 megs)  (320 x 240) wmv


(Barry Simmons)


4th February 2013
Click HERE for larger picture
Railcars 3007 /3008 down Gawler
Adelaide Rail Yard. Looking West.

4th February 2013
Click HERE for larger picture
Railcars 3139/3140 down Outer Harbour
Adelaide Rail Yard, Looking West.


4th February 2013
Click HERE for larger picture
From Port Road Bridge new laid tracks Noarlunga Line
from west end of Adelaide Rail Yard. Looking North.

4th February 2013
Click HERE for larger picture
From Port Road Bridge new laid tracks Noarlunga Line
from west end of Adelaide Rail Yard. Looking North.


Return to top of page

 



ADELAIDE  YARD  and  TORRENS  BRIDGE
3rd March 2013


Nearly a month after the resumption of passenger railcar services to the Adelaide Railway Station, no new work on the electrification of the Adelaide Rail Yard seems to have happened. By the Port Road bridge Thebarton an extra two new tracks have been laid in the centre between the Standard Gauge / Broad Gauge Goal Loop and the earlier new laid two tracks along side the new Royal Adelaide Hospital site. The Convention Centre extension has covered all the Adelaide Railway Station east of the Morphett Street bridge.


(Pics by Barry Simmons)


3rd March 2013
 Click HERE for larger picture
Adelaide Rail Yard with newly erected Catenary Poles.
Looking West.

3rd March 2013
Click HERE for larger picture
Adelaide Rail Yard with newly erected Catenary Poles.
Looking West.


3rd March 2013
 Click HERE for larger picture
Convention Centre extension verily covering all of 
Adelaide RWS east of Morphett St. Looking East.

3rd March 2013
Click HERE for larger picture
Convention Centre extension verily covering all of
Adelaide RWS east of Morphett St. Looking East.


3rd March 2013
 Click HERE for larger picture
Trans Adelaide Railcar passing Nairne Junction
with newly erected Catenary poles.
Looking West.

3rd March 2013
Click HERE for larger picture
Nairne Junction & old WYE Signal Cabin western
end of Adelaide Rail Yard with newly erected
Catenary poles.  Looking West.


3rd March 2013
Click HERE for larger picture

From Port Road bridge the centre two Tracks
newly  laid since 4th of Feb 2013.
Looking North.

3rd March 2013
Click HERE for larger picture
From Port Road bridge the centre two tracks
newly laid since 4th Feb 2013 between Goal Loop left
side & tracks by hospital site right side. Looking North.


3rd March 2013
Click HERE for larger picture
Taken from North Tce. Adelaide's new Royal Adelaide
Hospital site (former Adelaide Railcar Depot site) in
foreground with Adelaide Rail Yard & newly erected
 Catenary poles in background.  Looking North.

3rd March 2013
Click HERE for larger picture

Taken from North Tce. Adelaide's new Royal Adelaide
Hospital site (former Adelaide Railcar Depot site) in
foreground with Adelaide Rail Yard & newly erected
 Catenary poles in background.  Looking North.


3rd March 2013
Click HERE for larger picture

River Torrens Rail Bridge looking into the entry
of Adelaide Rail Yard. Looking South.

3rd March 2013
Click HERE for larger picture
River Torrens Rail Bridge with Outer Harbour lines
in foreground and Gawler lines in background.
Looking North East.


3rd March 2013
 Click HERE for larger picture
Railcars 3006/3003 crossing on Gawler line side
of River Torrens Rail Bridge. Looking South.

3rd March 2013
Click HERE for larger picture
Railcars 3112/3111 crossing on Outer Harbour line side
of River Torrens Rail Bridge. Looking South.


Return to top of page

 



NRM  REDHENS  TRIAL  TRIP  TO  ADELAIDE  RAILWAY  STATION
17th November 2013

 
 


No overhead catenary wiring as yet.

Two weeks before the National Rail Museum final 50th Anniversary event -Return of the Redhens Weekend - there's 3 test trips for Redhen railcars 321-400 with the first 2 trips starting at the Museum at Port Adelaide to the Adelaide Railway Station return, then the third trip starting at the Museum to Adelaide Railway Station then going to Dry Creek Railcar Depot for a check overnight before returning to Adelaide RWS then back to the Museum the next day from 1930hrs at Dry Creek and Adelaide RWS at 2000hrs .


(Pics by Barry Simmons)


17th November 2013
 Click HERE for larger picture
Redhen railcars 321-400 enters Nairne junction
Adelaide Rail Yard with WYE Signal Cabin in
background on trip from NRM to Adelaide RWS.
Looking West.

17th November 2013
Click HERE for larger picture
Redhen railcars 321-400 Adelaide Rail Yard 
on trip from NRM to Adelaide RWS.
 Looking North West.


17th November 2013
 Click HERE for larger picture
Redhen railcars 321-400 entering Adelaide RWS
under Morphett St. Bridge on trip from NRM to
Adelaide RWS.  Looking North East.

17th November 2013
Click HERE for larger picture
Redhen railcars 400-321 leaving Adelaide RWS
 under Morphett St on return trip to NRM.
Looking North East.


17th November 2013
 Click HERE for larger picture
Redhen railcars 400-321 leaving Adelaide RWS
on return trip to NRM. 
Looking North.

17th November 2013
Click HERE for larger picture

Redhen railcars 400-321 enters Nairne junction
 Adelaide Rail Yard on return trip to NRM with
WYE Signal Cabin in background. Looking West.


17th November 2013
Click HERE for larger picture

Redhen railcars 321-400 on trip from NRM to
Adelaide RWS enters Adelaide Rail Yard by
 Torrens River Rail Bridge with WYE Signal Cabin
 in background. Looking South.

17th November 2013
Click HERE for larger picture

Redhen railcars 400-321 on return trip
 to NRM leaving Adelaide Rail Yard by
Torrens River Rail Bridge.
Looking South.



Some other photo's taken in-between the Red Hen railcars of the Adelaide Yard, in the photo's here I don't know the exact names of the sections that hold the wires on the Catenary Poles to the left on photo where the Seaford & Belair line runs under south side of yard - then to the north side of yard the Gawler - Outer Harbor line side the catenary poles don't have these to right side of photo.
Also in some photo's in background you can see the cranes that are on the new Royal Adelaide Hospital construction site, plus the Adelaide Convention Centre extension which is built over the top on the ARS platforms is right unto the east side on the Morphett St Bridge. 


(Pics by Barry Simmons)


17th November 2013
 Click HERE for larger picture
View from Morphett St Bridge of Adelaide Yard with
Stanchions on Catenary Poles Seaford line Southern
side ready for wires - with Gawler-Outer line Northern
side without Stanchion on Catenary Poles. Looking West.

17th November 2013
Click HERE for larger picture
View from Morphett St Bridge of Adelaide Yard with
Stanchions on Catenary Poles Seaford line Southern
side ready for wires - with Gawler-Outer line Northern
side without Stanchion on Catenary Poles. Looking West.


17th November 2013
 Click HERE for larger picture
View from Morphett St Bridge of Adelaide Yard with
Stanchions on Catenary Poles Seaford line Southern
side ready for wires - with Gawler-Outer line Northern
side without Stanchion on Catenary Poles. 
Looking West.

17th November 2013
Click HERE for larger picture
Adelaide Yard with Stanchions on Catenary Poles
Seaford line Southern side ready for wires with
Gawler-Outer Harbor line without Stanchion on
Catenary Poles Northern side in background. 
Looking North West.


17th November 2013
Click HERE for larger picture
Adelaide Yard with Stanchions on Catenary Poles
Seaford line Southern side ready for wires with
railcars 3004-3010 on Gawler line without Stanchion
on Catenary Poles Northern side in background.
Looking North.

17th November 2013
Click HERE for larger picture
Adelaide Yard with Stanchions on Catenary Poles
Seaford line Southern side ready for wires with
Gawler-Outer Harbor line without Stanchion on
Catenary Poles Northern side with railcars 3133-3134
by the Morphett St Bridge with Convention Centre
on the opposite side.  Looking North East.


Return to top of page



OVERHEAD  ELECTRIC  WIRES  ADELAIDE  RAILWAY  STATION
22nd December 2013


The Adelaide Yard electrification have progressed with the electric wires attached to the Catenary Pole stanchions now. The wires are more easily seen at ground level than above on the pedestrian footpath of the Morphett St Bridge. The first 4 rail tracks on the southern side of the yard are for the new Seaford line which is nearly fully electrified, which are Platform 1 - 2 - 3 - 4 inside the Adelaide Railway Station.


(Pics by Barry Simmons)



22nd December 2013
Click HERE for larger picture
Adelaide Yard with electric wires attached
to stanchions on Catenary Poles. Looking West.

22nd December 2013
Click HERE for larger picture

Adelaide Yard with electric wires attached
to stanchions on Catenary Poles. Looking West.


22nd December 2013
Click HERE for larger picture

Adelaide Yard with electric wires attached
to stanchions on Catenary Poles. Looking West.

22nd December 2013
Click HERE for larger picture

Adelaide Yard with electric wires attached to
stanchions on Catenary Poles. Looking North West.


22nd December 2013
Click HERE for larger picture
Adelaide Yard with electric wires attached to
stanchions on Catenary Poles. Looking West.

22nd December 2013
Click HERE for larger picture

Adelaide Yard with electric wires attached to
stanchions on Catenary Poles. Looking North West.


22nd December 2013
Click HERE for larger picture
Adelaide Yard with electric wires attached to
stanchions on Catenary Poles & railcars 3135-3136
on Outer Harbor line. Looking West.

22nd December 2013
Click HERE for larger picture

Adelaide Yard with electric wires attached to
stanchions on Catenary Poles & railcars 3135-3136
on Outer Harbor line. Looking North East.


22nd December 2013
Click HERE for larger picture

Adelaide Yard with electric wires attached to
stanchions on Catenary Poles. Looking North West.

22nd December 2013
Click HERE for larger picture

Adelaide Yard with electric wires attached to
stanchions on Catenary Poles. Looking East.


THESE  NEXT  PHOTOS  WERE  TAKEN  FROM  THE  PORT  ROAD  BRIDGE.

22nd December 2013
Click HERE for larger picture

From Port Road bridge western end of Adelaide
electrified yard with the Seaford 2 lines at right,
then 2 Belair lines with
Goal Loop removed past
 WYE Signal Cabin, then the SG. Looking North.

22nd December 2013
Click HERE for larger picture

From Port Road bridge, left is the Seaford electrified
lines. The Belair 2 lines next, both both heading
out of the Adelaide yard with old Goal loop line
disconnected next to S/G line. Looking South.


22nd December 2013
Click HERE for larger picture

From Port Road bridge western end of Adelaide
Yard electrified with Goal Loop removed pass
the WYE Signal Cabin. Looking North.

22nd December 2013
Click HERE for larger picture

From Port Road bridge. From far left is the (2) Seaford
electrified lines. Next the (2) Belair lines, heading out
 of Adelaide yard with Goal loop track disconnected
and removed next to SG line. Looking South.


22nd December 2013
Click HERE for larger picture

From Port Road bridge western end of Adelaide
electrified Yard with the Goal Loop part removed
past the WYE Signal Cabin next to SG line.
 Looking North.

22nd December 2013
Click HERE for larger picture

From Port Road bridge western end of Adelaide
Yard with Goal Loop removed past the WYE Signal
Cabin with SG grain Train engines 2210,
2212,
2214, GWAxxx, GWAxxx. Looking North.


22nd December 2013
Click HERE for larger picture

From Port Road bridge western end of Adelaide Yard
SG Grain train engines 2210, 2212, 2214, GWAxxx,
GWAxxx. Belair 2 lines, Seaford electrified 2 lines.
 Looking North.


22nd December 2013
Click HERE for larger picture

From Port Road bridge western end of Adelaide
Yard electrified Seaford 2 tracks, then Belair 2
tracks & GWA Grain Train on S/G engines 2210,
2212, 2214, GWAxxx, GWAxxx. Looking North.

22nd December 2013
Click HERE for larger picture

From Port Road bridge western end of Adelaide
Yard a GWA Grain Train on S/G, then part removed
Goal loop, 2 tracks Belair line then
2 electrified
 tracks Seaford line.  Looking North.