GAWLER  LINE  UPGRADE  PART - 3


... click on the small picture to view a larger picture ...


MAWSON  LAKES  CONNECTING
STAGE 1  to  STAGE 2.

28 / 29th January 2012

 





28th January 2012

This weekend the 28th & 29th January 2012 is the time of joining the two stages of the Gawler Line Upgrade Stage-1 and Stage-2 together at Mawson Lakes Railway Station with the first Stage 1 from Adelaide Railway Station to Mawson Lakes Railway Station getting done in 2010, and Stage 2 between Mawson Lakes Railway Station to Gawler Central Railway Station still in progress which started on 18th September 2011. 

I couldn’t get into the Greenfield Railway Station today 28th which is closed off with all the track machinery parked there as well as the Road-Rail-Ballast-Train for joining the two stages of the Gawler Line Upgrade together. 

At the Mawson Lakes Railway Station there’s heavy machinery inside the station's two platforms cleaning out the old rail base and track all cordoned off as a construction site, so it was a walk along Elder Smith Drive to the top of the bridge for a location to get these photo’s of Mawson Lakes Railway Station being cleaned out today with the Platform surfaces getting a clean as well. 

 (Pics Barry Simmons)


22nd January 2012
Click HERE for larger picture

Mawson Lakes railway station with the break
 between the two Gawler line upgrade stages.
Looking south.

22nd January 2012
Click HERE for larger picture

From Greenfields rws platform down Gawler track
lengths of rail ready to join Gawler line upgrade
stage 1 and 2 together. Looking south.


28th January 2012

28th January 2012
Click HERE for larger picture

Earth moving machinery removing the the old
rail base with trucks waiting at Mawson Lakes.
Looking east. Taken from Augustine Street.


28th January 2012
Click HERE for larger picture

Atop of Mawson Lakes Elder Smith drive.
Footpath this left south side. Only bike path
on right north side of picture. Looking west.

29th January 2012
Click HERE for larger picture
Elder Smith Drive Mawson Lakes bridge.
Looking east


28th January 2012
Click HERE for larger picture

Mawson Lakes earth moving machinery removing
the old rail base between the two stages of the
Gawler line upgrade.  Looking north.

28th January 2012
Click HERE for larger picture
Mawson Lakes earth moving machinery removing
the old rail base between the two stages of the
GawlerlLine upgrade.  Looking north.


28th January 2012
Click HERE for larger picture

Cleaning track out Mawson Lakes with stage-1 of
Gawler line upgrade at the southern end of the
platforms & Dry Creek North rail yards to the
 right of picture. Looking south.

28th January 2012
Click HERE for larger picture
Cleaning out the Mawson Lakes rws with
stations  platform surface getting a clean out.
Looking south


28th January 2012
Click HERE for larger picture
Mawson Lakes rws with platform-2  left side almost 
cleaned now & stage-1 of the Gawler line upgrade
southern platform end. Looking south.

28th January 2012
Click HERE for larger picture

Mawson Lakes rws with platform-2  left side almost 
cleaned now & stage-1 of the Gawler line upgrade
southern platform end. Looking south.





29th January 2012
Morning

These next photo’s were taken next day 29th January 2012 from 9 a.m on top of the Mawson Lakes Bridge showing a machine placing the rail lengths in place on the down Gawler track, you can see that overnight they have put in the new ballast rail base and rolled and compacted and have placed in the cement sleepers with night lights stationed around with this job needing to be completed over this weekend for the Monday Rail Service from Adelaide. I also took picture of the Track Machines ( Tamper – Ballast Regulator ) and the two Road-Rail-Ballast-Train parked at the Greenfields Railway Station in readiness to complete the rejoining of the two stages of the Gawler Line Upgrade at Mawson Lakes . 


 (Pics Barry Simmons)


29th January 2012
Click HERE for larger picture

Placing rail lengths on the down Gawler track in
the rejoining of the stages of the Gawler line
upgrade with stage-1 in the background at
Mawson Lakes railway station, Looking south.

29th January 2012
Click HERE for larger picture

Placing rail lengths on the down Gawler track in
the rejoining of the stages of the Gawler line
upgrade with stage-1 in the background at
Mawson Lakes railway station, Looking south.


29th January 2012
Click HERE for larger picture

Placing rail lengths on the down Gawler track in
the rejoining of the stages of the Gawler line
upgrade with stage-1 in the background at
Mawson Lakes Railway Station, Looking south.

29th January 2012
Click HERE for larger picture
Rail track in lace at Mawson Lakes railway station
Looking south.



29th January 2012
Click HERE for larger picture

Rail track in place at Mawson Lakes railway station
Looking south.

29th January 2012
Click HERE for larger picture
Rail track in place at Mawson Lakes railway station
Looking south.


29th January 2012
Click HERE for larger picture
Placing a rail length on the down Gawler track in
the rejoining of the two stages of the Gawler
line upgrade at Mawson Lakes. Looking north.

29th January 2012
Click HERE for larger picture

Placing a rail length on the down Gawler track in
the rejoining of the two stages of the Gawler
line upgrade at Mawson Lakes. Looking north.


29th January 2012
Click HERE for larger picture

Placing a rail length on the down Gawler track in
the rejoining of the two stages of the Gawler
Line upgrade at Mawson Lakes. Looking north.
Note: rail track machines & Road-Rail-Ballast-Trains
 parked at Greenfields rws in background

29th January 2012
Click HERE for larger picture
Two Road-Rail-Ballast-Train & Track Machines
parked at Greenfields railway station getting
ready to rejoining the two stages of the Gawler
Line upgrade at Mawson Lakes Looking south.





29th January 2012
Afternoon

Went this afternoon to Mawson Lakes and got to see the other second Road-Rail ballasting train (green in colour) which I’ve seen only once near Nurlutta rws last month.  


 (Pics Barry Simmons)


29th January 2012
Click HERE for larger picture

Ballast Regulator & Tamper Vehicles on up Adelaide
 track getting into place before Road-Rail-Ballast Train
at Mawson Lakes railway station. Looking south. 

29th January 2012
Click HERE for larger picture

Road-Rail-Ballast-Train reversing into place
on up Adelaide track at Mawson Lakes
railway station. Looking south. 


29th January 2012
Click HERE for larger picture

Road-Rail-Ballast-Train reversing into place
on up Adelaide track at Mawson Lakes
railway station. Looking south. 

29th January 2012
Click HERE for larger picture
Road-Rail-Ballast-Train reversing into place
on up Adelaide track at Mawson Lakes
railway station. Looking south. 


29th January 2012
Click HERE for larger picture

Road-Rail-Ballast-Train reversing into place
on up Adelaide track at Mawson Lakes
railway station. Looking south. 

29th January 2012
Click HERE for larger picture
Road-Rail-Ballast-Train in place for spreading
Ballast on up Adelaide track at Mawson Lakes
railway station. Looking south.


29th January 2012
Click HERE for larger picture

Road-Rail-Ballast-Train in Place for spreading
Ballast on up Adelaide track at Mawson Lakes
railway station. Looking south.

29th January 2012
Click HERE for larger picture

Road-Rail-Ballast-Train on platform-2
 up Adelaide track Mawson Lakes
railway station. Looking south.


29th January 2012
Click HERE for larger picture

Road-Rail-Ballast-Train starting to spread ballast
 on up Adelaide track at Mawson Lakes
railway station. Looking south.

29th January 2012
Click HERE for larger picture
Road-Rail-Ballast-Train starting to spread ballast
  on up Adelaide Track at Mawson Lakes
railway station. Looking south.


29th January 2012
Click HERE for larger picture

First load of ballast spread on up Adelaide track
at Mawson Lakes railway station. Looking south

29th January 2012
Click HERE for larger picture
Two hours later- All tracks now ballasted at
Mawson Lakes railway station. Looking south.


29th January 2012
Click HERE for larger picture
Two hours later- All tracks now ballasted at
Mawson Lakes railway station. Looking south.

29th January 2012
Click HERE for larger picture
Two hours later- All tracks now ballasted at
Mawson Lakes railway station. Looking south.


4th February 2012
Click HERE for larger picture
Mawson Lakes Rail Service to Adelaide now running
again. Railcar 3118 in foreground. Looking south.

4th February 2012
Click HERE for larger picture
Dry Creek North Rail Yards from Mawson Lakes
Railway Station.  Looking south.


4th February 2012
Click HERE for larger picture

Stage1 & Stage2 Gawler line now rejoined
 Mawson Lakes Railway Station. Looking north.
Standard Gauge train CLF-VL 357 passes by.


4th February 2012
Click HERE for larger picture
Stage-1 Gawler Line Upgrade track rejoined
to Stage-2  between Mawson Lakes and
Greenfields.  Looking north.

FINALLY  11th March 2012
Click HERE for larger picture
 Stop Boards remaining without ballast mounds
See the white track area were ballast mounds
were removed today 11-04-2012. Looking north.


29th January 2012
Ballasting Mawson Lakes 

2.0 megs (320 x 240) (520Kb/Sec)