ADELAIDE - GAWLER
Line Major Works Project


PART - 3  Mawson Lakes to Gawler
2011 - 2012


BALLAST  and  TRACK  INSTALLATION

THERMIT  WELDING  SALISBURY  CROSSOVER

WOMMA

BROADMEADOWS


SMITHFIELD


MUNNO  PARA

KUDLA

TAMBELIN

EVANSTON

RACECOURSE  PLATFORM

GAWLER



... click on the small picture to view a larger picture ...



START OF STAGE 2
 REPLACING THE BALLAST AND TRACK

MAWSON LAKES  &  GREENFIELDS

 (Pics Barry Simmons)



26th October 2011
Click HERE for larger picture
Start of new ballast being laid at Mawson Lakes
Looking North.

26th October 2011
Click HERE for larger picture
Looking from Greenfields RWS newly laid ballast
looking towards Mawson Lakes Railway Station.


26th October 2011
Click HERE for larger picture
Greenfields Railway Station Platform 1 side,
Ballast laid up till this point so far.

27th October 2011
Click HERE for larger picture
Ballasting to Greenfields Railway Station
platform 2 side looking North.


27th October 2011
Click HERE for larger picture

Ballast being spread between Greenfields and
 Mawson Lakes Railway Station looking South.

27th October 2011
Click HERE for larger picture
Looking North towards Parafield Gardens RWS
 from northern end of Greenfield Station Platform.



3 days later.  30th October 2011
Short rail lengths just placed in middle of ballast ready to be put onto concrete sleepers.

30th October 2011
Click HERE for larger picture

New lengths of rail on new Ballast looking south
at Mawson Lakes from the Greenfields Station.

30th October 2011
Click HERE for larger picture
Greenfilelds looking south towards Mawson Lakes new
  lengths of rail on the new Ballast with NR 74 on SG.


30th October 2011
Click HERE for larger picture

Looking from Greenfields towards Parafield Gardens.

30th October 2011
Click HERE for larger picture
Parafield no ballast yet looking south.



3 days later again.  2nd November 2011
The concrete sleepers and the short rail lengths starting to be put in place onto the ballast.

2nd November 2011
Click HERE for larger picture

Start of the new track being laid in the last
two days at Mawson Lakes looking North.

2nd November 2011
Click HERE for larger picture

New Track just laid on ballast between Greenfields
and Mawson Lakes looking South.


2nd November 2011
Click HERE for larger picture

Close up view sleepers & Rails
looking towards Mawson Lakes.

2nd November 2011
Click HERE for larger picture

SG train passes start of new track being laid
at Mawson Lakes looking North.



4 days later again.  6th November 2011
Good bit more track put in

6th November 2011
Click HERE for larger picture

Greenfields RWS platform-2 side looking North

6th November 2011
Click HERE for larger picture

Greenfields north towards Parafield Gardens.


6th November 2011
Click HERE for larger picture
Greenfields Station looking South towards Mawson
Lakes. Adelaide Track left / Gawler track right.

6th November 2011
Click HERE for larger picture

Greenfields Railway Station Platform-1
ballast looking North.



2 days later again.  8th November 2011
Good bit more track put in

8th November 2011
Click HERE for larger picture
    Greenfields Railway Station Platform-1 side
looking South.

8th November 2011
Click HERE for larger picture

Northern end of Greenfields Railway Station looking
North towards Parafield Gardens railway Station.


8th November 2011
Click HERE for larger picture
Close up of rail joint at Greenfields Station.

8th November 2011
Click HERE for larger picture

Close up of temp rail joint at Greenfields Station.



5 days later again.  13th November 2011
Another outing to Mawson Lakes and Greenfields to get to see if the rail joints
have been welded since last Tuesday the 8th of November 5 day ago.

13th November 2011
Click HERE for larger picture

GWA Grainy on SG line going past at the welded
start of the Gawler Line upgrade stage 2 .

13th November 2011
Click HERE for larger picture

Close up of the Thermit Welded new Track
Greenfield Railway Station Platform-2 side


13th November 2011
Click HERE for larger picture

Welded Adelaide Track foreground. In background
 Gawler track not welded yet with SG in background.

13th November 2011
Click HERE for larger picture

Boxes of gear for welding process of the rail joints
between Greenfields and Mawson Lakes RWS.


4th December 2011
The first sight of placing ballast over the top of the Tracks started last week with
the up Adelaide bound track between Mawson Lakes to Parafield Railway Stations
 being done with the down Gawler bound track remaining incomplete .

4th December 2011
Click HERE for larger picture
South end of the Greenfields rws looking South
with PN Freight NR108 passing by the newly
ballasted up Adelaide Bound track.

4th December 2011
Click HERE for larger picture

Northern end of Greenfields railway station
 Looking North towards Parafield Gardens rws
 with the up Adelaide track now full ballast







Click to view Page
THE  REJOINING
STAGE - 1  and  STAGE - 2  TRACKS
AT  MAWSON  LAKES
.
28th / 29th January 2012

 



... click on the small picture to view a larger picture ...

PARAFIELD  GARDENS

(Pics Barry Simmons)

13th November 2011
Click HERE for larger picture

Parafield Gardens rws platform-1 looking North.
Gawler track.

13th November 2011
Click HERE for larger picture

Parafield Gardens rws platform-2 looking South
Adelaide Track. 




... click on the small picture to view a larger picture ...

PARAFIELD

(Pics Barry Simmons)

12th November 2011
Click HERE for larger picture

Parafield Railway Station looking South.

13th November 2011
Click HERE for larger picture

Parafield Railway Station Looking South.


13th November 2011
Click HERE for larger picture

Parafield Railway Station Looking South.

13th November 2011
Click HERE for larger picture
Kings Road Crossing at Parafield rws 
looking North towards Chidda Railway Station.


4th December 2011
Click HERE for larger picture

Truck and ballast wagon on up Adelaide bound
track at Parafield rws looking South.

4th December 2011
Click HERE for larger picture

Truck and ballast wagon on up Adelaide bound
track at Parafield rws looking South.




... click on the small picture to view a larger picture ...

CHIDDA

(Pics Barry Simmons)

13th December 2011
Click HERE for larger picture
QR National Freight train heading North
just past Chidda rws looking North.

13th December 2011
Click HERE for larger picture

Chidda platform-1 down Gawler. At far end of
platform ballasted up track reached. Looking South.


13th December 2011
Click HERE for larger picture
Chidda rws platform-2 up Adelaide looking South.
Ballasted, bit wavy, not been regulated yet. 

13th December 2011
Click HERE for larger picture

Chidda rws platform-1 down Gawler line.
Looking South. Not Ballasted as yet.


16th December 2011
Click HERE for larger picture
Chidda rws platform-2 up Adelaide looking South.
Ballasted, now track been regulated. 

16th December 2011
Click HERE for larger picture

Chidda rws platform-1 down Gawler line.
Looking South. Now Ballasted not regulated.


17th December 2011
Click HERE for larger picture

Ballast Regulator working on Up Adelaide Track
North of Chidda rws. Looking South.

17th December 2011
Click HERE for larger picture
Ballast Regulator working on Up Adelaide Track
North of Chidda rws. Looking South.


Short movie of Ballast Regulator.

2.6 megs (320 x 240) (520Kb/Sec)


15th March 2012
Click HERE for larger picture

Chidda rws new upgraded platform & new
shelter platform-2 side. Looking south.

15th March 2012
Click HERE for larger picture
Chidda rws new upgraded platform & new
shelter platform-1 side. Looking south.




... click on the small picture to view a larger picture ...

SALISBURY

(Pics Barry Simmons)

21st November 2011
Click HERE for larger picture

QR National Freight passing through Salisbury
Looking north looking toward Park Terrace.

21st November 2011
Click HERE for larger picture

QR National Freight passing Gawler Line Upgrade
Looking South by 20k marker, near Salisbury.


21st November 2011
Click HERE for larger picture
QR National Freight passing Gawler Line Upgrade
Looking south by 20k marker, near Salisbury.

21st November 2011
Click HERE for larger picture

QR National Freight passing Salisbury
Looking north toward Park Terrace.


25th November 2011
Click HERE for larger picture
20k marker looking North track machine placing
 wooden sleepers for Salisbury Station crossover
prior to Park Tce Crossing. Salisbury,

25th November 2011
Click HERE for larger picture

New wooden sleepers getting placed in for
 Salisbury Station crossover prior to Park Tce
 crossing looking North.


This crossover from North bound Gawler traffic platform-1 side to South Bound Adelaide platform-2 side on eastern
right side of Salisbury rws looking North as showed in pictures below only gets used on weekends. There're using new
wooden sleepers in this crossover track in last hundred metres before the Park Terrace Rail Crossing. If you look at the
 picture of the Salisbury Railway Station Photo’s from the "Salisbury to Pt Pirie Line 2010" page you see this crossover track.


25th November 2011
Click HERE for larger picture

Salisbury Station Crossover track looking South
from Park Terrace crossing. 

25th November 2011
Click HERE for larger picture
Salisbury Station Crossover looking South at
Park Tce crossing with SCT Freight Wagons


Looking north in opposite direction is Salisbury RWS.

25th November 2011
Click HERE for larger picture
9am trackwork platform-1 Gawler line at
Salisbury rws looking North.

25th November 2011
Click HERE for larger picture
9am trackwork platform-2 Adelaide line at
Salisbury rws looking North.


25th November 2011
Click HERE for larger picture

At 2pm the new track arrives at Salisbury RWS
looking North.


Ballasting now up to Salisbury Railway Station.

15th December 2011
Click HERE for larger picture

Looking South from Park Terrace crossing empty
ballast wagons parked on UP Adelaide Track with
Road/Rail ballast train working on DOWN Gawler
 line UP track to Salisbury Station crossover.

15th December 2011
Click HERE for larger picture
Looking south ballast wagons parked on UP
Adelaide track with Road/Rail Ballast Train
working on DOWN Gawler line heading towards
the Salisbury Station crossover.


15th December 2011
Click HERE for larger picture
Road/Rail ballast train with ballast spreader track
machine working behind on DOWN Gawler track
before Salisbury Station crossover looking South.

15th December 2011
Click HERE for larger picture
Road/Rail Ballast Train working on DOWN Gawler
 Broad Gauge track with CL108 Standard Gauge
freight heading South to Dry Creek.




Click HERE to view
The thermit welding rail joints page
at the Salisbury crossover.

17th December 2011

(Pics Barry Simmons)

17th December 2011
Click HERE for larger picture

Road/Rail Ballast Train parked at southern point
 beginning of Salisbury Station crossover 20k marker
waiting for welders to finish wait was about 5 hours.

17th December 2011
Click HERE for larger picture
Welding Team Southern end of Salisbury Station 
crossover starting work – with Road/Rail Ballast
 Train waiting on weld teams completion to progress
into Salisbury rws from Park Tce Xing looking south.


17th December 2011
Click HERE for larger picture
Road/Rail Ballast Train parked at the 20k post waiting
 on for welders to complete job before processing into
the Salisbury rws with rail regulator in background.

17th December 2011
Click HERE for larger picture
Road/Rail Ballast Train still waiting for the
rail joint welders to finish. Rainy day.


Once all the rail joint welds of the Salisbury Station Cross Over had been completed
the Road/Rail Ballast Train  crossed the Park Tce Rail Crossing into the Salisbury
 Railway Station platform-1 side on the down Gawler Track with a passing
 north bound Standard Gauge SCT Freight Train.

17th December 2011
Click HERE for larger picture

Road/Rail Ballast with Rail tamper Machine
 in the Background. Looking South.

17th December 2011
Click HERE for larger picture

Road/Rail Ballast Train heading over the Park Tce
Rail Crossing Salisbury. Looking South.


Short movies of Road-Rail ballast train reversing over crossing at Salisbury.



2.9 megs (320 x 240) (520Kb/Sec)



5.95 megs (320 x 240) (520Kb/Sec)


17th December 2011
Click HERE for larger picture

Road/Rail Ballast Train crossing the Park Tce Rail
Crossing into the Salisbury rws. Looking North.

17th December 2011
Click HERE for larger picture

Road/Rail Ballast Train enters Salisbury rws on
the Down Gawler Track platform 1 side with
passing SG  SCT Freight Train. Looking North.


17th December 2011
Click HERE for larger picture

Rail Tamper Machine stabled near the
Salisbury Station crossover. Looking South.

17th December 2011
Click HERE for larger picture

Rail Tamper Machine stabled by near the
Salisbury Station crossover. Looking South.


20th December 2011
Click HERE for larger picture

Road/Rail Ballast Train crossing over Salisbury Highway
 Looking North on the Gawler line Broad Gauge -
Pt Pirie SG line Rail Bridge just past the Salisbury rws.




... click on the small picture to view a larger picture ...

SALISBURY  JUNCTION  LINE  AT  21k

(Pics Barry Simmons)

25th November 2011
Click HERE for larger picture

Salisbury Rail Junction with road trucks
off-loading Ballast.  Looking South.

25th November 2011
Click HERE for larger picture

Trucks entering from the left with Ballast and 
exiting up track reversing back to the Salisbury
Rail Junction. Looking North.


25th November 2011
Click HERE for larger picture

Truck off-loading ballast at Salisbury Rail
 Junction Looking South with grader waiting.

29th November 2011
Click HERE for larger picture

Laying cement sleepers at the Salisbury Rail
 Junction at 21K marker where the Standard Gauge
parts company with the Gawler line heading West.


29th November 2011
Click HERE for larger picture
Tractor picking up stored concrete sleepers from
off old Penfield line for Gawler track placement. 

29th November 2011
Click HERE for larger picture
Tractor reversing with load of concrete sleepers
at the Salisbury Rail Junction. Looking South.


29th November 2011
Click HERE for larger picture

Tractor with concrete sleepers heading up to
sleeper placement crane. Looking South.

29th November 2011
Click HERE for larger picture

Track Work at Salisbury Rail Junction
with SCT freight wagons. Looking South.


29th November 2011
Click HERE for larger picture

Looking North from Salisbury Rail Junction towards
  Nurlutta rws. Rails laid on Adelaide bound Track,
but Gawler bound with only concrete sleepers laid.

29th November 2011
Click HERE for larger picture

Machine laying the concrete sleepers correctly
 placed apart, ready for the rail insertion at the
Salisbury Rail Junction 21k post.


30th November 2011
Click HERE for larger picture

Trolley for the track temporary rail bolt, 
fishplates joiners and motorised spanner.

30th November 2011
Click HERE for larger picture

Here using the Motorised spanner to tighten
the nuts on fishplate bolts.


30th November 2011
Click HERE for larger picture

Trolley and track maintenance workers attaching
the temporary rail fishplates before welding.

21st December 2011
Click HERE for larger picture

PN freight train NR 57, NR 111 heading North
at Salisbury Rail Junction. Looking South.


21st December 2011
Click HERE for larger picture

Salisbury Rail Junction looking South with
Orange PVC Marker getting place along the
 Gawler Line. Standard gauge line far right.


21st December 2011
Click HERE for larger picture
Road/Rail ballast train taken from Salisbury Rail
Junction Pedestrian Bridge.
Looking North towards Nurlutta Railway Station.

21st December 2011
Click HERE for larger picture

From Salisbury Rail Junction Road/Rail Ballast Train
start laying another layer of Ballast towards
Nurlutta Railway Station looking North




... click on the small picture to view a larger picture ...

NURLUTTA

(Pics Barry Simmons)

4th December 2011
Click HERE for larger picture

Nurlutta Railway Station Platform-2
Looking South.

4th December 2011
Click HERE for larger picture

Nurlutta RWS Platform-2 with Salisbury Rail Junction
 in background looking South.


4th December 2011
Click HERE for larger picture

Nurlutta Railway Station Platform-1
Looking North.

4th December 2011
Click HERE for larger picture

22k mark looking South to Nurlutta Railway Station
Platform-1


21st December 2011
Click HERE for larger picture
Road/Rail Ballast Train getting loaded up with
more ballast just north of the Nurlutta rws.

21st December 2011
Click HERE for larger picture

Road/Rail Ballast Train getting loaded up with
more ballast just north of the Nurlutta rws.




... click on the small picture to view a larger picture ...

ELIZABETH SOUTH

(Pics Barry Simmons)


6th December 2011
Rail Tracks have reached the Elizabeth South Railway Station in the last two days
Around the 24k Mark

6th December 2011
Click HERE for larger picture

Elizabeth South RWS Platform-1 down Gawler line
Looking North.

6th December 2011
Click HERE for larger picture

Elizabeth South RWS Platform-2 up Adelaide line
 Looking North.


12th January 2012
Tamper – on up Adelaide Track - Looking West.
Between Elizabeth South rws and Elizabeth rws, closer to Elizabeth South.


12th January 2012
Click HERE for larger picture

Tamper near Elizabeth South.

12th January 2012
Click HERE for larger picture
Tamper near Elizabeth South.


Tamper movies of working between Elizabeth South and Elizabeth.

12th January 2012
View above TAMPER machine at work
3.1 megs (320 x 240) (520Kb/Sec)
16th January 2012
View above TAMPER machine at work
2.1 megs (320 x 240) (520Kb/Sec)


6th May 2012
Newly Upgraded Elizabeth South.

6th May  2012
Click HERE for larger picture

Elizabeth South RWS island platform up Adelaide
 Platform-2 Left , down Gawler Platform-1 right.
Looking south.

6th May  2012
Click HERE for larger picture

Elizabeth South RWS island platform up Adelaide
Platform-2 Left , down Gawler Platform-1 right.
Looking south.


6th May  2012
Click HERE for larger picture

Elizabeth South RWS island Platform-2 side.
Looking south.

6th May  2012
Click HERE for larger picture

Elizabeth South RWS island Platform-1 side.
 Looking north.


6th May  2012
Click HERE for larger picture

Railcars 3131/3132 leaving Elizabeth South RWS
Platform-1 down Gawler.  Looking north.

6th May  2012
Click HERE for larger picture

Elizabeth South RWS Platform 2 up Adelaide side
with railcars 3140/3139 leaving Platform-1 down
Gawler side.  Looking west.




... click on the small picture to view a larger picture ...

ELIZABETH

(Pics Barry Simmons)


8th December 2011
Rail Tracks have near reached the Winterslow Road Bridge past Elizabeth.

8th December 2011
Click HERE for larger picture

Looking South at the down Gawler line from the 
Winterslow Rd Bridge. Elizabeth rws in distance.

8th December 2011
Click HERE for larger picture

Elizabeth rws in distance with the down track near
at the Winterslow Road bridge.  Looking South.



30th December 2011
Knowing that the work on the Gawler Line Upgrade is having a week off between xmas and New Year Eve with the public holiday
thrown with a week and a half off on break. With most of the workmen from Victoria as there’s no rail construction company in SA.
Today's two photo’s is to get to see how far the cement sleepers with rails and Ballast have reached on years end of 2011.


30th December 2011
Click HERE for larger picture

Elizabeth rws with Road/Rail Ballast Train and
track machines parked over Christmas/NYE break.
 Taken from Winterslow Rd Bridge. Looking South.

30th December 2011
Click HERE for larger picture

New Elizabeth rws construction site platform-2 side
with one of the vertical structures for the platform lifts. Road/Road Ballast Train parked in view. Looking West.



20th March 2012
Updated Elizabeth Railway Station

20th March 2012
Click HERE for larger picture

New Elizabeth Railway Station still under
construction. Looking north.

20th March 2012
Click HERE for larger picture

North facing stair & elevator towers of
new Elizabeth Railway Station. Looking west.


20th March 2012
Click HERE for larger picture

North facing stair & elevator towers of new
Elizabeth Railway Station.  Looking south,

20th March 2012
Click HERE for larger picture

North facing stair & elevator towers of new
Elizabeth Railway Station. Looking south.


1st April 2012
Click HERE for larger picture

North facing towers of new Elizabeth
Railway Station. Looking west.

1st April 2012
Click HERE for larger picture

Railcars 3126/3125 up Adelaide Track side
 of Elizabeth station. Looking west.



22nd April 2012
Updated Finished New Elizabeth Railway Station

22nd April 2012
Click HERE for larger picture
Two North Facing Elevator Tower of Elizabeth RWS.
Looking west.


22nd April 2012
Click HERE for larger picture

View of roof of new Elizabeth rws taken from
top of tower. Looking south.

22nd April 2012
Click HERE for larger picture

View of roof of new Elizabeth rws taken from
top of tower. Looking south.


22nd April 2012
Click HERE for larger picture

The Stonie going through Elizabeth rws platform-2
heading to Penrice Soda Osborne Plant.
Engines 704, 844, 841. Looking north.

22nd April 2012
Click HERE for larger picture

The Stonie going through Elizabeth rws platform-2 
heading to Penrice Soda Osborne Plant.
 Engines 704, 844,841. Looking south.


22nd April 2012
Click HERE for larger picture

Elizabeth rws Platform-1 side. Looking south.

22nd April 2012
Click HERE for larger picture

Elizabeth rws Platform-2 side. Looking north.




... click on the small picture to view a larger picture ...

WOMMA

(Pics Barry Simmons)


19th December 2011
Progress of the Track Installation today 19th of December 2011 the Ballast
has reach Kudla rws – the cement Sleepers has reach Munno Para rws.

19th December 2011
Click HERE for larger picture

Womma rws Platform-2 Up Adelaide Track.
Looking South.

19th December 2011
Click HERE for larger picture

Womma rws Platform-1 Up Gawler Track.
 Looking South


19th December 2011
Click HERE for larger picture

Womma rws Platform-2 Up Adelaide Track.
Looking South.

26th January 2012
Click HERE for larger picture
Womma Railway Station Platform-2 up Adelaide
Now ballasted. Looking Southwest.




... click on the small picture to view a larger picture ...

BROADMEADOWS

(Pics Barry Simmons)

19th December 2011
Click HERE for larger picture

Broadmeadows rws Platform-2 Up Adelaide Track.
 Looking South.

19th December 2011
Click HERE for larger picture

Broadmeadows rws Platform-1 down Gawler Track.
Looking South.




... click on the small picture to view a larger picture ...

SMITHFIELD



30th December 2011
Having a look at what point the track Installation has reached at the end of Year 2011.

Dropped in at the Smithfield railway station and found the ballast has been laid at the station without any track installed yet. The track is installed just before and after the Smithfield station on the other side of the Anderson Walk rail crossing. 
The next station up the track is the Munno Para railway station with the track installed there as well, this was another awkward station to photograph being a construction site being all fenced off. 
Last station I visited today is the Kudla railway station which was the easiest station to get into to photograph. Looking south at the Kudla railway station beyond the Dalkeith Road Rail Crossing, you can see the point were the laid concrete sleepers have reached before the Xmas break shut down. Also at the Kudla railway station platform-1 has ballast laid ending just north of the station, whereas platform-2 has no ballast laid, ending at the southern end of platform.

 
(Pics Barry Simmons)


30th December 2011
Click HERE for larger picture

Smithfield rws ballast laid track Installed
 each side of station. Looking South.

30th December 2011
Click HERE for larger picture

Smithfield rws Anderson Walk Rail Crossing
with track installed pass station. Looking North.


8th January 2012
Click HERE for larger picture

Smithfield taken from Anderson Walk rail crossing.
Looking South.

8th January 2012
Click HERE for larger picture
Smithfield railway station. 
Looking South.




... click on the small picture to view a larger picture ...

MUNNO PARA

(Pics Barry Simmons)


16th January 2012.
Video shot just south of the New Munno Para Railway Station  looking West.
The Road-Rail-Ballast-Train is operating on the down track.
View above TAMPER machine at work
8.6 megs (320 x 240) (520Kb/Sec)


30th December 2011
Click HERE for larger picture

New Munno Para railway station. Looking North.

30th December 2011
Click HERE for larger picture

New Munno Para railway station. Looking South.


2nd March 2012
Click HERE for larger picture

New Munno Para Railway Station.
Looking south.

2nd March 2012
Click HERE for larger picture

Street side view of New Munno Para rws. 
Looking north.


29th April 2012
Updated Finished New Munno Para Railway Station

29th April 2012
Click HERE for larger picture

Munno Para rws north facing towers.
Looking north.

29th April 2012
Click HERE for larger picture

Munno Para rws north facing tower, eastern side.
Looking west.


29th April 2012
Click HERE for larger picture

Munno Para rws platform 1 & 2 elevator towers
at ground level. Looking north.

29th April 2012
Click HERE for larger picture

View from walkway between the two towers
 of Munno Para rws.  Looking south.


29th April 2012
Click HERE for larger picture

Walkway between the two towers of the
Munno Para rws.  Looking east.

29th April 2012
Click HERE for larger picture

Walkway between the two towers of the
Munno Para rws.  Looking west.


29th April 2012
Click HERE for larger picture

Munno Para rws Platform – 1 side. Looking north.

29th April 2012
Click HERE for larger picture

Munno Para rws Platform-2 side. Looking north.


29th April 2012
Click HERE for larger picture

Munno Para rws Platform – 2 side. Looking south.

29th April 2012
Click HERE for larger picture

Munno Para rws Platform – 1 side. Looking south.


29th April 2012
Click HERE for larger picture

The Stonie ex Penrice quarries going through
Munno Para Platform – 2 heading to Penrice Soda
Osborne Plant. Engines 704, 844.  Looking north.

29th April 2012
Click HERE for larger picture

The Stonie going through Munno Para Platform – 2
heading to Penrice Soda Osborne Plant.
Engines 704, 844.  Looking south.




... click on the small picture to view a larger picture ...

KUDLA

(Pics Barry Simmons)

30th December 2011
Click HERE for larger picture

Kudla rws platform-2 no ballast laid yet.
Looking North.

30th December 2011
Click HERE for larger picture

Kudla rws platform- 1 ballast laid ending
just pass station. Looking North.


30th December 2011
Click HERE for larger picture
Kudla rws platform-2 with no ballast laid. 
Ballast laid up to Southern end of platform.
Concrete sleepers in paddock. Looking South.

30th December 2011
Click HERE for larger picture

Kudla rws ballast laid down to Gawler north of station
with up Adelaide ballast laid to southern end of station.
Looking South.


22nd January 2012
Click HERE for larger picture

Kudla rws down Gawler Platform-1
Looking North.

22nd January 2012
Click HERE for larger picture

Kudla rws down Gawler Platform-2
Looking North.


26th January 2012
Click HERE for larger picture
Kudla rws Platform-1 down Gawler.
Now ballasted.  Looking North.

3rd February 2012

Kudla Railway Station Platform 2 up Adelaide
Track been regulatated.  Looking north.




... click on the small picture to view a larger picture ...

TAMBELIN

(Pics Barry Simmons)

22nd January 2012
Click HERE for larger picture

Tambelin rws track laid just south side of station.
Looking South.

22nd January 2012
Click HERE for larger picture

Track Laying continues past Tambelin rws north
side of Clark Terrance Rail Crossing Evanston.


27th January 2012
Click HERE for larger picture

Tambelin Railway Station Looking South

27th January 2012
Click HERE for larger picture

Tambelin Railway Station Looking South


3rd February 2012
Click HERE for larger picture

Tambelin Railway Station ballasting being
done in distance.  Looking south.

7th February 2012
Click HERE for larger picture
Tambelin Railway Station Tampers parked.
Looking South Looking south.




... click on the small picture to view a larger picture ...

EVANSTON

(Pics Barry Simmons)

27th January 2012
Click HERE for larger picture

Gawler Line going under the bypass bridge from
 south end of Evanston station. Looking South.

27th January 2012
Click HERE for larger picture

Evanston Railway Station Platform-1
down Gawler side. Looking North.


27th January 2012
Click HERE for larger picture

Evanston with bypass bridge in the background.
Looking South at Para Rd Rail Crossing Gawler.

27th January 2012
Click HERE for larger picture

Evanston Railway Station Platform-1 down
 Gawler Side. Looking Northeast.


7th February 2012
Click HERE for larger picture

Evanston Railway Station with Tampers at work
in background. Looking south.

9th February 2012
Click HERE for larger picture
Evanston Railway Station.
Looking North.


9th February 2012
Click HERE for larger picture

Tamper at Work 38 K post near bypass bridge just
south of Evanston Railway Station Looking South

9th February 2012
Click HERE for larger picture
Evanston Railway Station.
Looking North.


Tamper machine south of Evanston.
9
th February 2012
View above TAMPER machine at work
10.3 megs (320 x 240) (520Kb/Sec)


29th April 2012
Updated Finished New Evanston Railway Station

29th April 2012
Click HERE for larger picture

Evanston rws platform-1 down Gawler railcars
3103/3104 Gawler Central bound. Looking north.

29th April 2012
Click HERE for larger picture

Evanston rws platform-2 up Adelaide.
Looking north.


29th April 2012
Click HERE for larger picture

Evanston rws platform-1 down Gawler.
Looking north.

29th April 2012
Click HERE for larger picture
Evanston rws platform-2 up Adelaide.
Looking north.


29th April 2012
Click HERE for larger picture
Evanston rws platform-1 down Gawler.
Looking south.

29th April 2012
Click HERE for larger picture
Evanston rws platform-1 down Gawler.
Looking south.




... click on the small picture to view a larger picture ...

GAWLER  RACECOURSE  PLATFORM

(Pics Barry Simmons)

9th February 2012
Click HERE for larger picture

Road-Rail-Ballast-Train Park at the Gawler
Racecourse Platform
. Looking North.

9th February 2012
Click HERE for larger picture
Road-Rail-Ballast-Train at Gawler
Racecourse Platform.
Looking South.


13th February 2012
Click HERE for larger picture

Road-Rail-Ballast-Trains parked by the Barnett
Street rail crossing. Gawler. Looking south.

13th February 2012
Click HERE for larger picture
Road-Rail-Ballast-Trains parked by the Barnett
Street rail crossing. Gawler. Looking south.


13th February 2012
Click HERE for larger picture

Gawler Racecourse Platform Looking towards
Barnett St crossing. Gawler. Looking south .

13th February 2012
Click HERE for larger picture
Gawler Racecourse Platform from Barnett
 Street rail crossing. Gawler. Looking north.




... click on the small picture to view a larger picture ...

GAWLER

(Pics Barry Simmons)

9th February 2012
Click HERE for larger picture

Ballast laid up to southside of the Gawler
Railway Station.
Looking North.

9th February 2012
Click HERE for larger picture
Ballast Laid up to southside of the Gawler
Railway Station
. Looking South.


15th February 2012
Click HERE for larger picture

Gawler Railway Station Pedestrian Crossing with
Roseworthy line in view. Looking west.


15th February 2012
Click HERE for larger picture

Gawler Railway Station pedestrian crossing
 with Roseworthy line in foreground and
 Substitute Buses in station car park in the
background.  Looking east.

-:  CONTINUED  :-

On Next page:  GAWLER  PART - 4
REPLACING  BALLAST  and  TRACKWORK  between
GAWLER  and  GAWLER  CENTRAL